HCC Eastside Campus Expansion

Location Houston, Texas

Project Detail

This project was for new Angela B. Morales Building and expansion of a parking lot on the HCC Eastside Campus. The three-story facility included faculty offices, student activity center, distance learning facilities, a lecture hall for 75, classrooms for 625 students, various configurations of computer labs and support spaces to serve a total of 350 PC stations, and two parking lots. Site work included new and reconfigured surface drives and two new parking lots totaling 249 parking spaces.  Sunland provided civil engineering and surveying services including topographic surveys, site grading, drainage, and site utilities for both the proposed building and parking lots. This project for an institution of higher education involved the surve–ying and design of a new parking lot and associated roadways at an existing campus.