Terminl D – DFW International

Location Dallas, Texas

Project Detail

Scheduled to open during the first quarter of 2005, the new International Terminal D is a two million square foot international terminal equipped with 23 wide-body swing-gates, a three-level roadway system, and an integrated 300-room hotel, complete with a rooftop swimming pool. The new terminal will contain 120 ticketing positions and a Federal Inspection Facility. A 100,000 square foot concession area will provide an abundance of choices for eating, shopping or browsing.

Sunland Group provided project management services including:

  • architectural design and design coordination
  • document control
  • quality assurance and quality control
  • construction administration support

During the design development phase, Sunland assisted with supervision and coordination of all construction documentation for the project, including CADD files.  During construction, Sunland assisted with the coordination of design change notifications, construction site reports, and package submittals.